{"id":125393,"date":"2026-02-16T09:39:34","date_gmt":"2026-02-16T08:39:34","guid":{"rendered":"https:\/\/poggi.tesecom.net\/impianto-integrato-per-la-valorizzazione-degli-scarti-di-marmo\/"},"modified":"2026-05-20T14:23:29","modified_gmt":"2026-05-20T12:23:29","slug":"integrated-system-for-marble-waste-valorization","status":"publish","type":"post","link":"https:\/\/new.poggi-spa.com\/en\/integrated-system-for-marble-waste-valorization\/","title":{"rendered":"Integrated system for marble waste valorization"},"content":{"rendered":"
Enhancing quarry waste means transforming residual material into finished products and high-value industrial by-products.<\/p>\n
In this project, Poggi supplied the main products and components, contributing to the development of an automated and integrated system.<\/p>\n
The process includes:<\/p>\n
Loading hopper<\/p>\n<\/li>\n
Bucket elevator<\/p>\n<\/li>\n
Polishing drum<\/p>\n<\/li>\n
Complete dust extraction and recovery system<\/p>\n<\/li>\n
Three-stage screening system<\/p>\n<\/li>\n
Storage silos for processed material and dust<\/p>\n<\/li>\n<\/ul>\n
One of the distinctive elements of the project is the valorization of marble dust, recovered and destined for sectors such as paper, cosmetics, toothpaste and industrial applications.<\/p>\n
From a design perspective, one of the main challenges was the implementation of truck loading at ground level, with part of the structure developed at -6 meters, a solution that required careful structural, mechanical and logistical configuration. This intervention highlighted Poggi\u2019s design skills and know-how in managing complex configurations, with an engineering approach oriented towards integration between product, plant layout and operational constraints.<\/p>\n
Also in this case, Poggi acted as an industrial partner, supplying products and mechanical components and supporting integration with existing systems, contributing to operational continuity and process control.<\/p>\n
In the PDF you will find:<\/p>\n
Detailed technical specifications<\/p>\n<\/li>\n
Design solutions for harsh climates<\/p>\n<\/li>\n
Installation process<\/p>\n<\/li>\n
Site images<\/p>\n<\/li>\n<\/ul>\n
Fill out the form and download the full document.<\/p>\n","protected":false},"excerpt":{"rendered":"
\ud83c\uddee\ud83c\uddf9 Italy | Integrated system for marble waste valorization Enhancing quarry waste means transforming residual material into finished products and high-value industrial by-products. In this project, Poggi supplied the main products and components, contributing to the development of an automated and integrated system. The process includes: Loading hopper Bucket elevator Polishing drum Complete dust extraction […]<\/p>\n","protected":false},"author":2,"featured_media":125684,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-125393","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"acf":[],"yoast_head":"\n